Frameworx Metric: # Hours for All Installations Committed, Between Customer Required and Committed Dates

Alt Frameworx Metric ID: ALTFRAMEWORXMETRICID#

BA Domain:

Business Value Driver:

Capability: FUL

Last Used:

Long FxMetric ID:

Reporting Detail:

Accuracy:

FxMetric UUID:

Responsibility: BMS

Capture Period:

Legacy Name: Sum of calendar time from Customer Required Date (CRD) to Customer Committed Date (CCD) for all installation commitments in period (where CCD is later than CRD).

Metric Special Name:

Metric Value Type:

Preferred:

Metric Type: Direct

State:

Entry Date: 9/30/2012

Short Metric ID:

Units: Hour

Alt-Cat1:

Alt-Cat2:

Alt-Cat3:

Category: Measure

Measurand: occurrence.installation

Metric Level:

Metric State: Active

Metric Topic:

Legacy Denominator FxMetric ID:

Legacy Denominator Name:

Legacy Factor: INCL: Total calendar time difference between CRD and CCD when CCD is later than CRD for all installation commitments in period. In case the CCD is earlier than CRD the calendar time difference is defined to be 0. When no customer specified CRD, the calen

Legacy FxMetric ID: 194

Legacy Numerator FxMetric ID:

Legacy Numerator Name:

Legacy Prose Ratio:

Measure # Hours for All Installations Committed, Between Customer Required and Committed Dates

Appears on these diagrams:

Frameworx Metrics (numerator for)

Issues

Frameworx Domains


This was created from the Frameworx 16.0 Model


Created from the TM Forum Model Frameworx 16.0.0 on 6/13/2016 at 22:58