Frameworx Home

Application Framework (TAM)

Business Process Framework (eTOM)

Business Process Framework Flows

Information Framework (SID)

Business Metrics High Level

All Diagrams

Frameworx Processes

Frameworx Applications

Information Framework ABEs

Frameworx Metrics

Views

Frameworx Metric: # NOC FTEs Assigned to Problem Resolution

Alt Frameworx Metric ID: ALTFRAMEWORXMETRICID#

BA Domain:

Business Value Driver:

Capability: ASR.HR

Last Used:

Long FxMetric ID:

Reporting Detail:

Accuracy:

FxMetric UUID:

Responsibility: BMS

Capture Period:

Legacy Name: Total number of NOC FTEs (Full Time Equivalent personnel) assigned to problem resolution tasks

Metric Special Name:

Metric Value Type:

Preferred:

Metric Type: Direct

State:

Entry Date: 9/30/2012

Short Metric ID:

Units: Number

Alt-Cat1:

Alt-Cat2:

Alt-Cat3:

Category: Measure

Measurand: stakeholder.employee.NOC_FTE

Metric Level:

Metric State: Active

Metric Topic:

FTEs = Full Time Equivalent personnel

Legacy Denominator FxMetric ID:

Legacy Denominator Name:

Legacy Factor: INCL: For this metric; an FTE is the equivalent of 40 hours of problem resolution time per week.; EXCL: ALL non-problem resolution time expended by NOC personnel.

Legacy FxMetric ID: 243

Legacy Numerator FxMetric ID:

Legacy Numerator Name:

Legacy Prose Ratio:

Measure # NOC FTEs Assigned to Problem Resolution

Appears on these diagrams:

Frameworx Metrics (denominator for)

Issues

Frameworx Domains


This was created from the Frameworx 16.0 Model


Created from the TM Forum Model Frameworx 16.0.0 on 6/13/2016 at 22:59