Frameworx Home

Application Framework (TAM)

Business Process Framework (eTOM)

Business Process Framework Flows

Information Framework (SID)

Business Metrics High Level

All Diagrams

Frameworx Processes

Frameworx Applications

Information Framework ABEs

Frameworx Metrics

Views

Frameworx Metric: $ Value of Future Infrastructure Build

Alt Frameworx Metric ID: ALTFRAMEWORXMETRICID#

BA Domain:

Business Value Driver:

Capability: NET.VAL

Last Used:

Long FxMetric ID:

Reporting Detail:

Accuracy:

FxMetric UUID:

Responsibility: BMS

Capture Period:

Legacy Name: SO allocation of Infrastructure build ( CAPEX /expected breakeven years) + OPEX

Metric Special Name:

Metric Value Type:

Preferred:

Metric Type: Direct

State:

Entry Date: 9/30/2012

Short Metric ID:

Units: Currency

Alt-Cat1:

Alt-Cat2:

Alt-Cat3:

Category: Measure

Measurand: resource.future_infrastructure_build

Metric Level:

Metric State: Active

Metric Topic:

(CAPEX /expected breakeven years) + OPEX

Legacy Denominator FxMetric ID:

Legacy Denominator Name:

Legacy Factor: INCL: CapEx useful to SO revenue generation (Equipment, Systems, Software, capitalized installation labor…); OpEx cost to operate new infrastructure until breakeven; EXCL: Capitalized Operating Expenses (motor vehicles, real-estate,…)

Legacy FxMetric ID: 178

Legacy Numerator FxMetric ID:

Legacy Numerator Name:

Legacy Prose Ratio:

Measure $ Value of Future Infrastructure Build

Appears on these diagrams:

Frameworx Metrics (numerator for)

Issues

Frameworx Domains


This was created from the Frameworx 16.0 Model


Created from the TM Forum Model Frameworx 16.0.0 on 6/13/2016 at 23:01