Frameworx Home

Application Framework (TAM)

Business Process Framework (eTOM)

Business Process Framework Flows

Information Framework (SID)

Business Metrics High Level

All Diagrams

Frameworx Processes

Frameworx Applications

Information Framework ABEs

Frameworx Metrics

Views

1.5.2 Resource Capability Delivery

(2) eTOM Process Type Resource Capability Delivery (3) eTOM Process Type Map & Analyze Resource Requirements (3) eTOM Process Type Capture Resource Capability Shortfalls (3) eTOM Process Type Gain Resource Capability Investment Approval (3) eTOM Process Type Design Resource Capabilities (3) eTOM Process Type Enable Resource Support & Operations (3) eTOM Process Type Manage Resource Capability Delivery (3) eTOM Process Type Manage Handover to Resource Operations

1.5.2 Resource Capability Delivery

Diagram Description

Resource Capability Delivery processes use the capability definition or requirements to deploy new and/or enhanced technologies and associated resources.
The objectives of these processes is to ensure that network, application and computing resources are deployed, according to the plans set by Resource Development. They deliver the physical resource capabilities necessary for the ongoing operations, and long term well-being of the enterprise, and ensure the basis on which all resources and services will be built.
Responsibilities of the Resource Capability Delivery processes include, but are not limited to:
·
Planning resource supply logistics (warehousing, transport, etc)
·
Planning the Resource Installation
·
Contracting and Directing the Resource Construction where needed
·
Verifying the Resource Installation
·
Handover the Resource Capability to Operations through interactions with the Manage Resource Class Configuration
Logical network configurations (such as resource elements integration) are as important to the network resources as the physical aspects. All aspects must be planned and considered in the design and implementation of the network, including infrastructure owned by the enterprise, and by supplier/partners, other physical resources and logical elements.

Issues


This was created from the Frameworx 16.0 Model


Created from the TM Forum Model Frameworx 16.0.0 on 6/13/2016 at 22:03